Train movement table

Move

Time

Type

From

To

Remarks

1

0040

Empty coal

Dunalistair

Rae Bridge

Includes DR shunting loco, train stabled in RB loop on arrival

2

0100

Empty coal**

Rae Bridge

Inverlochan

Continues from #1 as required

3

0340

Coal**

Inverlochan

Dunalistair

Through working as reqd.

4

0440

Empty coal**

Dunalistair

Rae Bridge

Runs as reqd., wait in UP loop

5

0540

Passenger

Rae Bridge

Dunalistair

Uses DR shunting loco

6

0540

Empty coal

Rae Bridge

Inverlochan

Through working

6a

0650

Passenger

Dunalistair

Rae Bridge

Uses DR shunting loco

7

0640

Passenger

Craigcorrie

Dunalistair

In Rae Bridge combine with loco and coach off #6a.

8

0820

Passenger

Dunalistair

Rae Bridge

Connect with branch mixed

9

A0900

B mixed

Branch FY

Rae Bridge

back into RB down road

10

0900

Tram

Rae Bridge

Creag Dhubh

Tram working to fiddle yard

11

0900

Passenger

Rae Bridge

Craigcorrie

Ex 8 - work into storage loops

12

0900

B mixed

Rae Bridge

Dunalistair

Work into DR after shunting RB

13

A 1040

Tram

Creag Dhubh

Rae Bridge

Tram working from fiddle yard

14

1020

B mixed

Dunalistair

Rae Bridge à on branch

Enter RB wrong road, shunt then continue to rear of station

15

1000

Mixed

Craigcorrie

Rae Bridge

Wait in RB down road

16

1120

B mixed

Rae Bridge

Branch FY

proceed to branch fiddle yard

17

1100

Mixed

Rae Bridge

Dunalistair

Work into DR after shunting RB

18

1140

Coal

Inverlochan

Rae Bridge

Wait in RB down road

19

1200

Mixed

Dunalistair

Rae Bridge

Enter RB up road and wait

20

1240

Tram

Rae Bridge

Creag Dhubh

Tram working to fiddle yard

21

1240

Coal

Rae Bridge

Dunalistair

Work into DR harbour area

22

1300

Mixed

Rae Bridge

Craigcorrie

Shunt RB, then to GCR, IL, CC

23

1320

B goods

Branch FY

Dunalistair

Work into RB, shunt RB or proceed to DR platform road

24

1440

Empty coal

Dunalistair

Inverlochan

Through working

25

1520

B goods

Dunalistair

Rae Bridge

Shunt DR, work into RB, shunt RB and wait in up road

26

A 1540

Tram

Creag Dhubh

Rae Bridge

Tram working from fiddle yard

27

A 1600

B passenger

Branch FY

Dunalistair

Back into RB down rd, then DR

28

1640

B goods

Rae Bridge

Branch FY

Reverse, then up branch

29

1720

B passenger

Dunalistair

Rae Bridge à on branch

Enter RB wrong road, shunt then continue to rear of station

30

1600

Goods*

Craigcorrie

Rae Bridge

Work into RB down rd

31

1800

B passenger

Rae Bridge

Branch FY

Wait for goods, then up branch

32

1820

Tram

Rae Bridge

Creag Dhubh

Tram working to fiddle yard

33

1800

Goods*

Rae Bridge

Dunalistair

Shunt RB à DR harbour road

34

1920

Mixed

Dunalistair

Rae Bridge

Shunt DR, work into RB, shunt RB, drop carriage in shed and wait in up road

35

A 2020

Tram

Creag Dhubh

Rae Bridge

Tram working from fiddle yard

36

1940

Passenger

Craigcorrie

Dunalistair

Dunalistair Mail

37

2040

Goods*

Rae Bridge

Craigcorrie

(Ex 34) shunt RB, then to GCR, CC

38

2120

Passenger

Dunalistair

Craigcorrie

Dunalistair Mail

39

2240

Coal

Inverlochan

Dunalistair

Through working to DR

* passengers for intermediate stations carried in brake van

** night through working as required